Skip to content

One team, from site visit to report.

The work begins with a site visit. Samples, measurements and the final report are connected stages of the same investigation.

Arrange a site visit
A crew member working on site, with the Otto van behind
Otto field archive · Bodrum

Quote valid for 30 daysScope and price are provided in writing after the site visit.

15 business days after fieldworkThe report delivery period is counted from completion of fieldwork.

  1. Site visit

    The plot location, building plans and truck access are assessed together. An itemised written quote sets out the scope of work.

    Output: scope of work and a written quote
  2. Drilling

    A truck-mounted rig or portable core drilling system is selected to suit site access. Borehole count and depth follow the investigation plan, with every borehole recorded in photos and video.

    Output: borehole records and samples
  3. Geophysics

    Seismic measurements are assessed alongside borehole data to examine soil classification and layer structure.

    Output: measurement results and a ground profile
  4. Laboratory

    Samples are sent to an external laboratory in Aydın with their borehole, depth and date. Each test result is linked to its sample.

    Output: test reports linked to samples
  5. Report delivery

    Field and laboratory results are brought together in the data and geotechnical reports. Additional reports are included as required by the application.

    Output: the engineering file for your application

What to prepare for the site visit

A location is enough for the first conversation. The team will help clarify the other details.

  • Location or block and parcel number
  • Building plans, storey count and footprint, if available
  • Recent photos of the access road and plot

Questions about the process

When do I need a geotechnical survey?

You need one to obtain a building permit. Full answer

How long until the report is delivered?

Within 15 business days after drilling is complete. Full answer

What decides the price of a geotechnical survey?

Not before the plot has been seen. Full answer

Who receives the report? Does Otto submit it to the municipality?

The report is delivered to you and to the architect or structural engineer designing your project. Full answer

All questions