Skip to content

Geotechnical survey in Milas

Milas is one of the two districts the Ortakent office works in all the time. From the zoning study at Kazıklı to the housing and hotel plots at Boğaziçi, the same crew works at plan scale and on single plots. The borehole count is set on site and the report is written to TBDY 2018.

Get a quote for your plot

From Kazıklı to Boğaziçi

The largest piece of work in Milas was at Kazıklı. The planning-stage geological survey prepared for Muğla Metropolitan Municipality covered a plan area of 1,000 hectares. Work at that scale is different from drilling a single plot. Settlement suitability is assessed for the whole area, and the zoning plan is drawn from that report.

At Boğaziçi the work is housing and hotel plots. The ground investigations for a 56-block housing project and a 10-block hotel and residence project were completed for Shelton A.Ş. On both plots the drilling programme followed the needs of the building, with the borehole count and depth set on site.

Plots around Güllük, Ören, Kıyıkışlacık, Güvercinlik and Bafa get the same crew. The office is in Ortakent, the service area is the whole of Bodrum and Milas, and further afield is rare. Being close brings both the drilling day and the report date forward.

Work completed in Milas

The Milas jobs from the reference list, with the client's name. One is a plan-scale survey for a municipality, two are housing and hotel plots on the coast.

Boğaziçi (Milas) 56-block development, geotechnical survey

Shelton A.Ş.Milas · Boğaziçi · Housing and hotels

Boğaziçi (Milas) 10-block hotel and residence project, geotechnical survey

Shelton A.Ş.Milas · Boğaziçi · Housing and hotels

Kazıklı, Milas, planning-stage geological survey over 1,000 ha

Muğla Büyükşehir BelediyesiMilas · Kazıklı · Public sector and zoning

Neighbourhoods worked in

Two Milas neighbourhoods appear in the reference list. The other neighbourhoods on the coast and next to Bodrum are in the same service area, and the site visit is arranged from Ortakent.

In the reference list

  • Kazıklı1 job
  • Boğaziçi2 jobs

In the same service area

Güllük, Ören, Kıyıkışlacık, Selimiye, Bafa, Güvercinlik, Dörttepe, Beçin, Hacıilyas and Çamköy.

How the work runs in Milas

  1. Site visit

    You send the location or the block and parcel number and the crew drives out from Ortakent to Milas. The road, the truck's way in and the borehole points are checked on site, and the quote is given in writing.

  2. Fieldwork

    Core drilling is done with the truck-mounted rig, and a seismic line is added where needed. Samples are boxed with their borehole and depth.

  3. Testing

    Samples go to the laboratory, and the results are entered in the report alongside the borehole they came from.

  4. Report

    The data report and the geotechnical report are delivered as one file, in the format the municipality requires for the permit file.

Questions specific to Milas

The office is in Bodrum. Do you really come to Milas?
For a plot in Güllük or Ören, which authority asks for the report?

The building permit file goes to Milas Municipality, and the ground report is part of that file. Full answer

Is drilling done differently on a coastal plot like Boğaziçi?

The rule does not change. Full answer

Questions on price, timing and process

A site visit for your plot in Milas.

Send the location and the crew comes from Ortakent. The scope is settled on the plot, and the quote comes in writing.