Skip to content

Core drilling in Bodrum and Milas

Our truck-mounted rigs recover cores in rock and soil. On plots a truck cannot enter, our portable core drilling system helps speed up site preparation. Borehole depths and samples are recorded throughout the investigation.

Get a quote for this service
Otto-branded Ford drilling truck with its mast raised
Otto Mühendislik field archive

Scope of work

The work items are confirmed in the quote, based on the plot and project requirements.

  • Truck-mounted rig, its position set at the site visit
  • Core drilling in rock and soil
  • Core box labelled with its depth and sent to the laboratory
  • Depth and date record for every borehole
  • A written site-preparation list at the site visit

What you receive

Borehole log
Depth, layers and sample levels for every borehole.
Core photographs
In the box, with the depth written on it. Appended to the report.
Field video
The day the borehole was drilled, dated.

Not every plot in Bodrum takes the same truck. Otto Mühendislik looks at which rig will come at the site visit and plans the smaller rig for a narrow gate.

The truck's route in Bodrum

The crew has drilled on housing and hotel plots across the peninsula, in Ortakent, Yahşi, Konacık and Göltürkbükü among others, and at Kazıklı and Boğaziçi in Milas. What makes drilling hard in Bodrum is access as much as rock. Sloping plots, narrow village roads and stone walls decide where the truck can get in. Otto Mühendislik has two truck-mounted rigs, the smaller one is planned for a narrow gate, and where no truck can enter the portable core drill does the work. If something has to be cleared, it is set out in writing on the day of the site visit.

What sets the price

The price of drilling is set by the number of boreholes, the depth of each one and the type of ground. Coring advances more slowly in rock than in soil, and that changes the number of days on site. How the rig gets onto the plot and the preparation of the area also go into the quote. Otto Mühendislik writes these items after seeing the plot, and when drilling is part of a wider programme it sits in the same quote as the seismic and laboratory items.

A record for every borehole

On drilling day the depth and date of every borehole are written down, the metre each core came from is marked on the box, and the borehole is recorded in photos and video. That record goes into the report's appendix. Months later, when the municipality or the structural engineer asks which borehole a value came from, the answer is on the box and in the report.

Common questions

Can the drilling truck reach my plot? Bodrum has steep, narrow roads.

Most plots, yes. Full answer

How many days does drilling take?

It depends on the number of boreholes, the depth and the type of ground. Full answer

What happens to the cores?

The depth is written on the box. Full answer

Will it damage the garden?

Work happens in a small area around the borehole. Full answer

All questions

Start with the plot location.

Share a location or block and parcel number. The team will contact you about a site visit and quote.

Get a quote