Skip to content

Planning-stage geological survey in Bodrum and Milas

When an area is being zoned or a zoning plan changes, municipalities require a geological and geotechnical survey of settlement suitability, and the plan is drawn from that report. Otto Mühendislik has completed this survey for Bodrum Municipality at Göktepe, for Muğla Metropolitan Municipality on 1,000 hectares at Kazıklı in Milas, and for Didim Municipality at Tavşanburnu.

Get a quote for this service
Otto drilling truck and field crew on open ground
Otto Mühendislik field archive

Scope of work

The work items are confirmed in the quote, based on the plot and project requirements.

  • Geological and geotechnical assessment of the plan area
  • Settlement-suitability maps
  • Report formatted for institutional approval
  • Field organisation for large-area studies

What you receive

Geological and geotechnical survey report
For the whole plan area.
Settlement-suitability maps
At the same scale as the plan sheets.
Approval file
In the order the municipality and the provincial directorate require.

The crew has delivered plan-scale surveys and knows the report format and the approval process public institutions expect.

The institutional process

A planning-stage survey begins at the request of the municipality or the metropolitan municipality. The plan area is walked, borehole and measurement points are distributed according to its geology, and the results are entered on settlement-suitability maps. The report goes through the municipality to the provincial directorate of the Ministry of Environment for approval, and the plan is drawn after that approval. Otto Mühendislik has run this process end to end with Bodrum Municipality, Muğla Metropolitan Municipality and Didim Municipality.

Field organisation over a large area

The Kazıklı study in Milas covered not a single plot but an area larger than a whole neighbourhood. On jobs like this the truck's route, the order of the boreholes and the layout of the seismic lines are planned in advance, and the crew works in the field for days. Borehole logs, seismic profiles and laboratory results are collected in one file, and the map sheets are drawn at plan scale. The same code and the same layout apply as for a report written for a single plot.

Settlement-suitability maps

The main output of the survey is the settlement-suitability map. It says which part of the plan area is suitable for building, which is suitable with precautions and which is not, and the zoning plan is drawn from it. The maps are prepared at the same scale as the plan sheets, supported by the borehole and seismic data, and go into the file in the format the municipality and the provincial directorate require.

Common questions

Who needs a planning-stage geological survey?

Municipalities. Full answer

How is it different from a plot survey?

The difference is scale. Full answer

What do time and price depend on?

The size of the area, the number of boreholes and measurements, and the report format the institution requires. Full answer

All questions

Start with the plot location.

Share a location or block and parcel number. The team will contact you about a site visit and quote.