Urban renewal ground report in Bodrum and Milas
If your building in Bodrum or Milas has been classed as risky, or you are applying under the urban renewal scheme to demolish and rebuild, the file needs a ground report written to TBDY 2018. Otto Mühendislik prepares that report in the format the municipality and the provincial ministry directorate require.
Get a quote for this service
Scope of work
The work items are confirmed in the quote, based on the plot and project requirements.
- Urban renewal report to TBDY 2018
- The borehole, seismic and laboratory data it requires
- Application file in the required format
- Quoted together with the permit survey
What you receive
- Urban renewal report
- To TBDY 2018, in the institution's format.
- Permit survey
- In the same file, from the same site visit, if requested.
The report is prepared in the format required by the municipality and provincial directorate.
The urban renewal file in Bodrum
In Bodrum and Milas, an owner whose building has been classed as risky, or who wants to demolish and rebuild, puts a ground report written to TBDY 2018 into the file. The report goes to the provincial directorate of the Ministry of Environment as well as the municipality, so it is prepared in the format both institutions require. Drilling is done in the garden or a suitable open spot while the old building is still standing, and planned for after demolition if there is no room. Otto Mühendislik delivers the report to the owner or contractor handling the application.
What sets the price
The price of an urban renewal report is made up of the same items as a permit-stage survey. The number and depth of boreholes, rock or soil, the number of seismic lines and the number of laboratory tests are set at the site visit. If the same plot also needs a permit-stage survey, the two reports are written in one quote from one field programme, and the truck does not come twice. The quote is given item by item after the plot has been seen.
After delivery
Once the report is in the file, any question from the municipality or the provincial directorate is answered by Otto Mühendislik. What came out of the ground is on record, a clarification is added to the report if needed, and you do not chase the file. Because urban renewal files in Bodrum go to two institutions, the report is prepared in the format both require at the first delivery.
Common questions
Is an urban renewal report different from a standard survey?
The fieldwork is the same, with drilling, seismic survey and laboratory tests carried out as usual. Full answer
Who files the application?
The owner or contractor handles the application. Full answer
Can drilling be done while the old building is still standing?
It can be done in the garden or a suitable open spot. Full answer
Start with the plot location.
Share a location or block and parcel number. The team will contact you about a site visit and quote.